Library · Funding & Distribution
Funding criteria pre-check
Every new project runs through a deterministic point calculation (feature film, documentary, animation) with caps and cultural minimum criteria…
Funding & Distribution · Project Management
1–2 h per projecttypical savings per month (estimate from practice)
Overview
Who it's for
Project Management
You need
Requires: Foundation
You get
Reliable point result with buffer/risk; Log in the project file
Problem. The points of the cultural eligibility test are often calculated roughly in your head — a calculation error can sink the whole application.
Solution. Every new project runs through a deterministic point calculation (feature film, documentary, animation) with caps and cultural minimum criteria applied cleanly. The result, including a point buffer, is stored in the project file.
automatic approval manual
Results
- Reliable point result with buffer/risk
- Log in the project file
Key metrics
- Miscalculated applications = 0